PART L COMPLIANCE
Part L Air Leakage
Testing of Buildings
Air pressure testing evaluates a building's air tightness — identifying uncontrolled leakage through gaps, holes or cracks that impact energy efficiency and increase running costs.
24 Hour Delivery
Report emailed within 24 hours
Nationwide Coverage
Call, text or order online
Trusted by Solicitors
Relied on across the industry
HOW IT'S DONE
The Testing Process
Once you or your architects provide complete drawings — floor plans, sections, elevations and a site plan — we use your design stage SAP or SBEM air tightness target as the benchmark for testing.
Fan Installation
A large fan is temporarily fitted, usually in a doorway, ready to begin the test.
Sealing Openings
Openings to the property are temporarily sealed before the fan is switched on.
Pressure Measurement
Air pressure is gradually increased and decreased, recording the differential at each step.
Leakage Calculation
Airflow at 50 Pa is divided by the building envelope area to give the leakage rate in m³/h.m².
WHY DO I NEED IT
Who Needs This Test
New Builds
Mandatory for new residential and commercial constructions since 2006 (2010 in Scotland).
Extended Commercial Properties
Larger commercial extensions typically require testing to meet Part L standards.
Residential Extensions & Conversions
Not always legally required, but often tested for peace of mind and energy performance.
ADDRESSING FAILURE
Common Causes of a Failed Test
Insufficient sealing around windows and doors
Gaps and spaces behind fitted units
Cracks and gaps around electrical sockets
Poorly sealed junctions at the wall-floor connection
Unsealed spaces around pipework and service penetrations
FURTHER DIAGNOSTICS
Pinpointing Problem Areas
Smoke Testing
We fill the building with smoke and pressurise the space, giving a visible indication of problem areas as smoke escapes through openings. Smoke pencils are used for more targeted checks.
Depressurisation
The whole building is pressurised, forcing air out through gaps and cracks. As pressure is reduced, draughts reveal exactly where air is escaping.
Thermography
Infrared cameras detect the hottest and coldest spots in the building, pinpointing insulation and air leakage issues that aren't visible to the eye.
Potential Heat Loss Prevented
Typical Test Duration
Standard Test Pressure
Report Turnaround
FAQS
Air Testing Questions Answered
It's an assessment of a building's air tightness — also called air permeability or leakage rate — identifying uncontrolled air leakage through gaps, holes or cracks in the building fabric.
Yes, for new residential and commercial constructions in England, Wales and Northern Ireland since 2006, and in Scotland since 2010, to meet design stage SAP or SBEM air permeability targets.
Complete drawings including floor plans, sections, elevations and a site plan, along with the air tightness target from your design stage SAP or SBEM calculations.
Generally no more than two hours, depending on property size and preparation. It should be carried out towards the end of the project.
We offer consultation, on-site training and further diagnostic testing — including smoke testing, depressurisation and thermography — to pinpoint and resolve the problem areas.
Book Your Air Pressure Test Today
Nationwide coverage, fast turnaround, and reports trusted by solicitors and contractors across the UK.